Socket - Belton, Micalex, 8 Pin, Octal PC Mount, Long Lead

Socket - Belton, Micalex, 8 Pin, Octal PC Mount, Long Lead

Belton
Socket - Belton, Micalex, 8 Pin, Octal PC Mount, Long Lead image 1
Socket - Belton, Micalex, 8 Pin, Octal PC Mount, Long Lead image 2
Socket - Belton, Micalex, 8 Pin, Octal PC Mount, Long Lead image 3
Click to zoom in
Socket - Belton, Micalex, 8 Pin, Octal PC Mount, Long Lead image 1Socket - Belton, Micalex, 8 Pin, Octal PC Mount, Long Lead image 2Socket - Belton, Micalex, 8 Pin, Octal PC Mount, Long Lead image 3
In Stock

Belton 8-pin Micalex PC mount tube socket with long leads commonly used for octal based power, preamp, and rectifier tubes. Applicable for use with all types of electronic equipment using vacuum tubes.

  • Convenient top or bottom mount capabilities
  • 1-1/4” chassis hole required
  • 1-1/2” oblong mounting centers

Features:

  • Paddle saddle mounting
  • Easy mount with the saddle of extruded screw hole
  • Phosphorous bronze pin terminal with tin plating
  • Glassfiber filled PPS Insulating material
  • Long leads
RoHS Compliant
SKU:
P-ST8-209MIPPCL
Item ID:
003362
UPC/EAN:
609722131810
Belton Part Number:
VT8-PT
Brand:
Belton
Product Measurements by Type
Body Diameter30 mm
Body Height14.5 mm
Item Height22.8 mm
Item Length50 mm
Item Width34 mm
Mounting Hole Center to Center40 mm
Mounting Hole Width3.5 mm
Packaging Information
Packaging Dimensions2 in. × 1.4 in. × 1.4 in.
Weight (Packaging)0.037 lbs.
PDF: DrawingAll Models

My Project Lists

You must be logged in to add items to a project list.

Specifications, Files, and Documents

PDF: Drawing Drawing125.35 KB